LIFTING & TRANSPORTATION OF A 650t SHORE CRANE FROM GENOA TO LEGHORN

 Interprogetti Genova was appointed to design the lifting, sea fastening and transportation of a 650 t shore crane. The lifting pad eyes were fitted on the legs of the crane and this required detailed strength analysis of the crane structures during lifting operations.